Our competent welding engineers examine all details about manufacturing and welding according to approved technical drawings and spesifications on steel structures. Production and quality folders are checked in detail. If needed, quality controls plans (ITP) are prepared based on international standards. All raw material certificates are controlled and material conformity is checked.
Main control steps are as below: